VGP Triblavina – G Hall

Designed and installed according to FM GLOBAL part G1 (Coca Cola), G2 (Hossa & Family) and G3 (Hollex) Freezers and refrigerators for Hossa & Family Warehouses for Coca-Cola and Hollex Three wet valve stations Use of dry sprinkler heads Number of heads +3000 pcs Implementation data Customer

Read More

VGP Triblavina – F Hall

Designed and installed according to FM GLOBAL Tire stock for CONTINENTAL Six wet valve stations Number of heads approx. 9000 pcs Implementation data Customer VGP Triblavina Date Year 2021 Work water system Related projects VGP Triblavina – Hala F References VGP Triblavina – Hala A References Write

Read More

VGP Triblavina – A Hall

Designed and installed according to FM GLOBAL Stock of food and supplies for pets Six wet valve stations Number of heads +7000 pcs Implementation data Customer VGP Triblavina Date Year 2021 Work water system Related projects VGP Triblavina – Hala A References Porsche – Horná Streda, Slovakia

Read More

Porsche – Horná Streda, Slovakia

Projektováno a instalováno podle VdS normy. TRASER je držitelem VdS certifikace. Počet ventilových stanic 15 kusů. Výstavba vodního zdroje se 3 vodními nádržemi, 3 sprinklerová VdS čerpadla. Instalovaný počet hlavic více než 8000. Během instalace a při projektování byly použity 3D programy jako revit a koordinace mezi

Read More

VW H9

Designed and installed according to VdS CEA 4001. Storage of HVB batteries for el. cars. Two wet valve stations located in the engine room of the valve stations in the building of hall H9. Number of heads 1400 pieces Implementation data Client VW Year 2019 Type Water

Read More

VW H2

Designed and installed according to VdS CEA 4001. Valve station engine room. Seven wet valve stations located in the valve station engine room in the H2 building. Implementation data Client VW Year 2018-2020 Type Water System Ďalšie referencie VW H9 References VW H2 References Sledujte nás

Read More

VGP HATVAN HUNGARY

Designed and installed according to MSZ EN12845. Protected storage hall and a new engine room with 2 pumps and 1 tank located near the hall, also possible collection for fire brigades for 4 fire trucks according to empty Hungarian legislation. Implementation data Client VGP Year 2019 Type

Read More

Mondi Ružomberok

OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA Designed and installed by FM Global. Protected warehouse of paper rolls as well as the production of a paper hall and the paper machine itself, and a waste paper conveyor. Near the hall there is a new engine room with 3

Read More

Jaguar Land Rover Nitra

Designed and installed according to NFPA, JLR standard. Number of wet and dry valve stations over 50 pieces. 7 valve stations. More than 50,000 heads installed. During the installation and design, 3D programs such as revit and coordination between professions were used through the Navisworks program. Implementation

Read More

Volkswagen Bratislava – vodny zdroj pre SHZ

Designed and installed according to VdS CEA 4001. New SHZ engine room with 2 diesel pumps and 1 tank, also possible collection for fire brigades. Implementation data Client VW Year 2018 Type Water System Ďalšie referencie VW H9 References VW H2 References Sledujte nás

Read More