VW H2
Designed and installed according to VdS CEA 4001. Valve station engine room. Seven wet valve stations located in the valve station engine room in the H2 building. Implementation data Client VW Year 2018-2020 Type Water System Ďalšie referencie VW H9 References VW H2 References Sledujte nás
VGP HATVAN HUNGARY
Designed and installed according to MSZ EN12845. Protected storage hall and a new engine room with 2 pumps and 1 tank located near the hall, also possible collection for fire brigades for 4 fire trucks according to empty Hungarian legislation. Implementation data Client VGP Year 2019 Type
Mondi Ružomberok
OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA Designed and installed by FM Global. Protected warehouse of paper rolls as well as the production of a paper hall and the paper machine itself, and a waste paper conveyor. Near the hall there is a new engine room with 3
Jaguar Land Rover Nitra
Designed and installed according to NFPA, JLR standard. Number of wet and dry valve stations over 50 pieces. 7 valve stations. More than 50,000 heads installed. During the installation and design, 3D programs such as revit and coordination between professions were used through the Navisworks program. Implementation
Volkswagen Bratislava – vodny zdroj pre SHZ
Designed and installed according to VdS CEA 4001. New SHZ engine room with 2 diesel pumps and 1 tank, also possible collection for fire brigades. Implementation data Client VW Year 2018 Type Water System Ďalšie referencie VW H9 References VW H2 References Sledujte nás
Recent Comments