Designed and installed according to NFPA, JLR standard.
Number of wet and dry valve stations over 50 pieces. 7 valve stations. More than 50,000 heads installed. During the installation and design, 3D programs such as revit and coordination between professions were used through the Navisworks program.
Implementation data
Client
Jaguar Land Rover Nitra
Year
2017
Type
Water , Dry and Gas System